Or perhaps "lost and foundation" after waiting a couple of months. Extruded polystyrene going in first, 100mm underneath (two 50mm as that's the thickest they've got here) then 50mm around the sides. Later another 100mm will be put around the sides up to ground floor level to make 150mm.